| 802-862-3000

Railroad Bridge

When Tropical Storm Irene struck Vermont in August of 2011 a LOT of infrastructure was destroyed. Vermont Rail Systems came to see us in October with these two photos - before and after - and incredibly the time between the two was only 3 weeks. The company felt they needed to thank the contractors who made this miracle happen some how. This plaque is what we came up with. They were given out during a lunch on board a train. 

Follow Us on Instagram